AW-16672548152 GT-NGWQVD7M
news

FG Completes 63km Port Harcourt-Aba Railway Project

By Peregba Jerry

The project is part of the larger Port Harcourt-Maiduguri railroad initiated by the administration of former President Muhammadu Buhari.

The managing director of Nigeria Railway Corporation (NRC), Mr Fidet Okhiria, revealed this when he led a delegation to inspect the project.

He said train services would commence in a few months as soon as finishing touches are completed on the tracks.

“The project from Port Harcourt to Maiduguri is not yet completed. They (contractors) are working in phases, and they have laid tracks up to Aba.

“We are so anxious to commence operation, therefore, the Minister of Transportation, Mu’azu Sambo, directed us to come and inspect the project so that we can plan ahead of the operations.

“We inspected from Port Harcourt to Aba, and we can confirm the main tracks have reached Aba in Abia,” he said.

Okhiria said that the contractors were still installing loop and side lines, so that rail services can start immediately.

“As we speak, you can put a locomotive on the track to Aba, but that will not be good enough for commercial purposes, hence, we are working hard to resume operations.

“We are looking to start operations within months, and we have drawn a timeline. If we don’t start running on the track, it will go bad, and vandals will take possession.

“We are going to meet and work out possible plan, so very soon, Port Harcourt-Aba train services will start,” he added.

Okhiria warned against vandalizing the rail tracks, so as to allow the people to directly benefit from the project.

According to him, the NRC has finalised plans to renovate its existing wagons to run alongside the new ones being expected.

“Two wagons were awarded consisting of both narrow and standard gauge, but we will not wait for them to arrive, we are starting something soon.

“We plan to start something very soon so that people will not be able to differentiate between the old functioning ones and the new ones.

“Rolling stock has a lifespan of 30 years, hence, we will make sure that we refurbish them and make them attractive for people to use,” he said.

The managing director assured that the federal government would complete the laying of the Port Harcourt-Maiduguri rail tracks within three years. (NAN)

FOR ADVERT AND NEWS PUBLICATION, EMAIL US @ tarakirivoicenewspaper@gmail.com or call or WhatsApp us on 08160439769

Show More

Tarakiri Voice

Nigeria’s number one news portal. tarakirivoice.com.ng reaches over 70million Nigerians, delivering extensive breaking news and national interest stories. Our readers want to get to the point of the stories that really matter, so we bring this to them with timely news updates around the clock. Tarakiri voice Newspaper is a daily Nigerian online Newspaper, founded by PASSMAN AKPOS in 2020. Is one of the Newspaper that tells the story as it happened without fear or favour. It has no political coloration through it reportage. its bends on affecting human life and the environment positively, having in the background the African concept, portraying her in a good light to the rest of the world. Its determine to investigate news thoroughly as its happened. Is a 21st century news media that tells that African story in a green light

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Verified by MonsterInsights